PRICEWORK

Please see bellow for available jobs.

Bricklaying for large detached house LE5

Brick/Block works for a large detached house/summerhouse. see attached plans. All materials and consumables to be supplied on site. Labour must supply own PPE and Small plant to complete Job. Access plant onsite. Drawings Attached Timeline -60 days Terms – Nett 14 Days Status: In Progress

Boarding & Plastering | Leicester LE5

240m2 of ceilings 620m2 of walls Both walls and ceilings are to boarded with standard Gyproc 12.5mm plaster boards and skimmed to a fine finish. This is to include all beading and taping. We also require 260 ml of shadow beading to the walls and 170ml of shadow beading in place of architrave. All materials....

Drainage works – large detached house LE5

Drainage/services works for detached house/summer house see attached plans Status: In Progress

Demolition of 3 bed detached house LE5

Demolition of a 3 bed detached house (see pictures) All skips & Scaffold to be supplied on site. Labour must supply own PPE and Small plant to complete Job. Access plant onsite. Drawings Attached Timeline – 14 Days Terms – Nett 14 Days Status: In Progress

Ground Works for large detached house LE5

Footings for large 4 bed detached house/detached summer house. dig and concrete see attached plans All materials and consumables to be supplied on site. Labour must supply own PPE and Small plant to complete Job. Access plant onsite. Drawings Attached Timeline – 5 Days Terms – Nett 14 days Status: In Progress

Install 12 x Interior Doors | Leicester LE5

Install 12 fully glazed aluminum frameless pivot hinged interior doors, all supplied to site. Status: In Progress Deadline: 05-04-2019

Install floor joists

To install timber floor joists with caber floor and install flat roof beams and OSB roof for GRP system this includes fillet and firing strips   Status: In Progress Deadline: 01-04-2019

Stud Wall Timber Work | Leicester LE5

65ml of 2.4 metre high C16 4″ x 2″ timber stud work. 45ml to ground floor 20ml to the first floor. OSB lining to 155m2 All materials supplied. Completion  in three weeks Status: In Progress Deadline: 05-04-2019

Joist Works to First Floor – 78 Sqm @ H.Grove

Install 38 no. 250x50mm C16 floor joists on to inner leaf of block work on new extension, with noggins & Caber deck (Aquadeck) All materials and consumables to be supplied on site. Labour must supply own PPE and Small plant to complete Job. Access plant onsite. Layout drawing to be supplied onsite. Timeline – 4 Days Approx –....

Joinery Timber framed summer house LE5

Construct timber framed summer house as per drawing (brick outer skin by bricklayers) All materials and consumables to be supplied on site. Labour must supply own PPE and Small plant to complete Job. Access plant onsite. Drawings Attached Timeline – 10 days Terms – Nett 14 days Status: In Progress

Joinery Truss install Large House LE5

Truss install for large 4 bed detached house and summer house see plans All materials and consumables to be supplied on site. Labour must supply own PPE and Small plant to complete Job. Access plant onsite. Drawings Attached Timeline – 17 days Terms – Nett 14 days Status: In Progress

Joinery | First Floor Joist Installation Build One

  The installation of 34 individual 75 X 195 C24 timber joists complete with the cutting and installing of 46 noggins perpendicular to the joists. Drawings are attached, please review these. Separate packages are being raised for four further modules to building number two. Status: In Progress

Monocouche render | Leicester LE5

94m2 over five low level block work areas. Finished ‘off white’ – colour number to be confirmed. Required completion one week Supply and install Status: In Progress Deadline: 05-04-2019

Roofing, large detached house/summer house LE5

Felt/batten large detached house/summer house inc. fitting all upvc plastic roofline as per plans attached All materials and consumables to be supplied on site. Labour must supply own PPE and Small plant to complete Job. Access plant onsite. Drawings Attached Timeline – 25 days Terms – Nett 14 days Status: In Progress

Domestic Supply & Fit Glazing in LE2

Premier Development Contractors (PDC) have a domestic glazing contract opportunity for April 2019 in Leicester LE2 area. Interested parties to supply a quote for the below; Site Background Ground floor refurbishment of a residential semi-detached property. A standard brick structure with tiled hip roof. Off road parking. Site occupied. Work includes a single storey extension.....

Fitting 13 UPVC Windows, 6 UPVC doors LE9

Fit 13 UPVC windows, 4 single doors, 2 double doors, all windows and doors need to be glazed using toe/heel method and correct packers. clear silicone seal on the outside and foamed on the inside. cils to be horned in to match existing and have end caps fitted. installed into new openings and fixed into blockwork (to....

TOP